DocumentCode
2636512
Title
Field trials of Cutout mounted reclosers on single-phase spur lines in ESB networks, Ireland
Author
Murray, Thomas P. ; Jones, Andrew
Author_Institution
ESB Networks, Dublin, Ireland
fYear
2010
fDate
19-22 April 2010
Firstpage
1
Lastpage
6
Abstract
The high proportion of rural overhead networks comprised of single-phase spurs (laterals) and the high proportion of interruptions due to momentary faults has focused DNOs on measures to lower outage rates for customers fed from spurs. The bonus to be gained from reducing such outages is very clear, given the incentive scheme imposed by the national energy regulator. The Distribution Network Operator installed cutout mounted reclosers on 29 spurs operating at 10kV and 20kV and have monitored their operation closely for over a year now. There were some initial issues around the handling/operation of the Cutout mounted reclosers and in the selection of suitable spurs for inclusion in the trial. Since then, the cutout mounted reclosers have operated as expected and some outage penalties have been avoided. Results so far are generally positive but must be considered interim until a larger volume of feedback/monitoring information has been gathered and analysed. The ratings of the cutout mounted recloser were not ideally matched to the characteristics of the trial network, so opportunities for improvement remain.
Keywords
Circuit faults; Costs; Earth; Fuses; Incentive schemes; Intelligent networks; Medium voltage; Monitoring; Spine; Transformers; Cutout mounted recloser; ESB Networks; characteristic; faults; feeder; laterals; outages; ratings; reclosers; single-phase; spurs;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Conference and Exposition, 2010 IEEE PES
Conference_Location
New Orleans, LA, USA
Print_ISBN
978-1-4244-6546-0
Type
conf
DOI
10.1109/TDC.2010.5484219
Filename
5484219
Link To Document