A New Approach for Generator Maintenance Scheduling in Deregulated Power Systems
Author
Chen, Sung-Ling ; Huang, Kun-Yuan ; Huang, Yann-Chang
Author_Institution
Dept. of Electr. Eng., Cheng Shiu Univ., Kaohsiung
fYear
2008
fDate
18-20 June 2008
Firstpage
302
Lastpage
302
Abstract
This paper presents a parallel-refined simulated annealing (PRSA) approach for the generator maintenance scheduling (GMS) problem to maximize profit objective function. The merit of simulated annealing (SA) is preserved and the deficiency is pruned away in the proposed PRSA. The proposed PRSA is an effective method because the multiple search trajectories parallel and refined in each stage. The near optimal solution for each trajectory in current state can be derived from the local optimal solutions by using the parallel optimization process. The proposed parallel searching strategy can obtain optimal or near-optimal solution for the GMS problem. This paper has demonstrated the effectiveness and feasibility of applying the proposed approach for the 50-unit GMS problem.
Keywords
power engineering computing; power generation scheduling; search problems; simulated annealing; deregulated power system; generator maintenance scheduling; parallel searching strategy; parallel-refined simulated annealing; Costs; Dynamic programming; GSM; Large-scale systems; Linear programming; Optimization methods; Power generation; Power system simulation; Power systems; Simulated annealing;
fLanguage
English
Publisher
ieee
Conference_Titel
Innovative Computing Information and Control, 2008. ICICIC '08. 3rd International Conference on
Conference_Location
Dalian, Liaoning
Print_ISBN
978-0-7695-3161-8
Electronic_ISBN
978-0-7695-3161-8
Type
conf
DOI
10.1109/ICICIC.2008.52
Filename
4603491
Link To Document