• DocumentCode
    2640439
  • Title

    Quality first A model for TQM implementation and planning

  • Author

    Adams, Martin L.

  • fYear
    1993
  • fDate
    20-23 Sep 1993
  • Firstpage
    283
  • Lastpage
    285
  • Abstract
    Experience at Harris with managing change through continuous improvement (CI) has demonstrated it is a sociotechnical process - that is, the human elements are crucial and must be addressed before pressing for structural, institutional or technological change. Harris utilizes a five-stage business improvement model. It is not a road map to problem solving, rather it is an analysis and direction-setting framework, which can be applied to virtually any business situation. It has been used to insert major technology advances, characterize multifunctional business processes, solve a problem, develop a new product, improve a service, etc. The model is easy to teach, easy to understand, and easy to follow. It guides the application of the correct set of CI tools at the correct time to achieve the goal
  • Keywords
    Continuous improvement; Electronic switching systems; Humans; Organizational aspects; Pressing; Problem-solving; Process planning; Quality management; Roads; Total quality management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    AUTOTESTCON '93. IEEE Systems Readiness Technology Conference. Proceedings
  • Conference_Location
    San Antonio, TX
  • Print_ISBN
    0-7803-0646-5
  • Type

    conf

  • DOI
    10.1109/AUTEST.1993.396342
  • Filename
    396342