DocumentCode :
2640962
Title :
Globally optimal solutions to the on-ramp metering problem - Part 2
Author :
Gomes, Gabriel ; Horowitz, Roberto
Author_Institution :
Dept. of Mech. Eng., California Univ., Berkeley, CA, USA
fYear :
2004
fDate :
3-6 Oct. 2004
Firstpage :
515
Lastpage :
520
Abstract :
For pt.I, see ibid., p.509-14 (2004). The main results of part 1 are summarized and extended. The problems of the rapidly decaying mainline cost weights, non-zero on-ramp cost weights, and the lack of on-ramp queue length constraints in the original formulation are resolved by introducing two new assumptions: 1) congestion on the mainline does not spill onto the on-ramps, and 2) r-ic=0. A numerical example based on a 14-mile stretch of a congested freeway is used to demonstrate the technique. The example predicts a 8.4% savings in the total travel time, with queue constraints, over the 5-hour peak period.
Keywords :
linear programming; minimisation; road traffic; traffic control; global optimal solutions; linear programming; mainline congestion freeway; nonzero on-ramp cost weights; on-ramp metering problem; on-ramp queue length constraints; rapidly decaying mainline cost weights; total travel time minimization; traffic control; Costs; Delay; Mechanical engineering; Optimal control; Road accidents; Road vehicles; Sufficient conditions; Time factors; Time measurement; Traffic control;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Transportation Systems, 2004. Proceedings. The 7th International IEEE Conference on
Print_ISBN :
0-7803-8500-4
Type :
conf
DOI :
10.1109/ITSC.2004.1398953
Filename :
1398953
Link To Document :
بازگشت