DocumentCode :
2641067
Title :
Computer integrated control system of a new slab caster in the Mizushima Works
Author :
Urakami, Masahiko ; Yamane, Akira
Author_Institution :
Kawasaki Steel Corp., Mizushima, Kurashiki, Japan
fYear :
1993
fDate :
27-29 Sep 1993
Firstpage :
265
Lastpage :
274
Abstract :
In 1993, No. 4 Continuous Caster (No. 4 CC) went on stream on Kawasaki Steel´s Mizushima Works. At No. 4 CC, an integrated EIC (Electrical, Instrumentation, Process Computer) control system was adopted. The background of the selection of the integrated EIC system, the general outline of the system, system performance after introduction, and the design features of the main operation room are described
Keywords :
casting; computer integrated manufacturing; industrial control; steel industry; steel manufacture; Continuous Caster; EIC system; Kawasaki Steel; Mizushima Works; computer integrated control; design features; process computer control; slab caster; system performance; Centralized control; Data engineering; Distributed control; Instruments; Knowledge engineering; Metals industry; Programmable control; Slabs; Solids; Steel;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Emerging Technologies and Factory Automation, 1993. Design and Operations of Intelligent Factories. Workshop Proceedings., IEEE 2nd International Workshop on
Conference_Location :
Palm Cove-Cairns, Qld.
Print_ISBN :
0-7803-0985-5
Type :
conf
DOI :
10.1109/ETFA.1993.396400
Filename :
396400
Link To Document :
بازگشت