• DocumentCode
    2642121
  • Title

    Relation between skill revel and input-output time delay

  • Author

    Hidaka, Koichi ; Saida, Kazumasa ; Suzuki, Satoshi

  • Author_Institution
    Department of Electrical Engineering, Tokyo Denki University, Japan
  • fYear
    2006
  • fDate
    4-6 Oct. 2006
  • Firstpage
    557
  • Lastpage
    561
  • Abstract
    In this paper, we try to obtain knowledge about human skill on machine operation, using data measured by simple test, and analyze up-skilling. In order to obtain experimental data for human manipulation, we utilize a tele operated robot system. For the tele operation, it is necessary that human operates machine by using image information from display monitor. We aim at the acquisition of evaluation quantity about state of skill, and pay attention to delay time during the machine operation. For the skill, we investigated correlation with response delay time of human operation and control characteristics of the operations. We confirmed a possibility of quantification of progress of the up-skilling.
  • Keywords
    Condition monitoring; Control systems; Delay effects; Displays; Humans; Mechatronics; Robots; Testing; Time factors; Time measurement; human skillARX; machine operation; time-delay;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Aided Control System Design, 2006 IEEE International Conference on Control Applications, 2006 IEEE International Symposium on Intelligent Control, 2006 IEEE
  • Conference_Location
    Munich, Germany
  • Print_ISBN
    0-7803-9797-5
  • Electronic_ISBN
    0-7803-9797-5
  • Type

    conf

  • DOI
    10.1109/CACSD-CCA-ISIC.2006.4776706
  • Filename
    4776706