• DocumentCode
    264295
  • Title

    Feasibility assessment of the installation of a photovoltaic system as a battery charging center in a mexican mining company

  • Author

    Banda, Diana ; Pena, Rafael ; Gutierrez, Geydy ; Juarez, Edith ; Visairo, Nancy ; Nunez, Ciro

  • Author_Institution
    Fac. de Ing., Univ. Autonoma de San Luis Potosi, San Luis Potosí, Mexico
  • fYear
    2014
  • fDate
    5-7 Nov. 2014
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper presents a study of feasibility assessment of the installation of a photovoltaic system to supply energy to the external lighting of a private mining company, located in Cerro de San Pedro, San Luis Potosí, Mexico. The photovoltaic system will charge batteries during the day, and then these batteries will be used to provide the electricity to the external lighting over the night. This scheme aims to replace the utilization of diesel generators used in conjunction with the lightning system. For completeness of this work, the economical study including the payback time is reported.
  • Keywords
    battery management systems; diesel-electric generators; lighting; mining industry; photovoltaic power systems; Mexican mining company; battery charging center; diesel generator utilization; feasibility assessment; lightning system; photovoltaic system installation; Batteries; Companies; Inverters; Lighting; Photovoltaic systems; Regulators; Solar radiation; Feasibility Study; Lighting System; Photovoltaic System; Renewable Energy;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power, Electronics and Computing (ROPEC), 2014 IEEE International Autumn Meeting on
  • Conference_Location
    Ixtapa
  • Type

    conf

  • DOI
    10.1109/ROPEC.2014.7036352
  • Filename
    7036352