Title
An approach of PI gain scheduling with hysteresis switching for the control of boiler drum level in the coal-fired power generation units
Author
Bi, Zhenfu ; Pan, Yuezhi ; Zhang, Qiang ; Wang, Fusheng
Author_Institution
Department of Instrument and Control at Shandong Electric Power Research Institute, Jinan, 250002 China
fYear
2006
fDate
4-6 Oct. 2006
Firstpage
1517
Lastpage
1521
Abstract
An approach, where hysteresis switching logic is used in gain scheduling of PI controller, is proposed and applied practically in the control of boiler drum level of 4× 300MW coal-fired power generation units. The parameterized candidate PI controllers are designed at a number of operating points based on on-site engineering tuning/tests, and, hysteresis switching logic, which is shown theoretically can be used with the aim that switching stops in finite time, is applied to make controller decision over those candidate PI controllers. The unit generation output is used as scheduling variable by the hysteresis switching logic. The proposed controller structure is used to control drum level of 4×300MW coal-fired power generation units at Zouxian Power Generation Inc, P.R.China.
Keywords
Algorithm design and analysis; Boilers; Computational modeling; Control nonlinearities; Hysteresis; Logic; Power engineering and energy; Power engineering computing; Power generation; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Aided Control System Design, 2006 IEEE International Conference on Control Applications, 2006 IEEE International Symposium on Intelligent Control, 2006 IEEE
Conference_Location
Munich, Germany
Print_ISBN
0-7803-9797-5
Electronic_ISBN
0-7803-9797-5
Type
conf
DOI
10.1109/CACSD-CCA-ISIC.2006.4776866
Filename
4776866
Link To Document