Abstract
Vertical integration is a long-term issue in automation. Bridging the gap between the control systems and the systems at enterprise layers is still not solved completely. There are a number of approaches defining interfaces, but the functional integration is not sufficiently focused on. Function block concepts have been developed to perform this functional integration at the control systems´ level. The paper discusses an approach to use the IEC 61499 function block concept to interconnect functions from the control system layer with functions at MES and ERP levels. Concepts and requirements for this integration are discussed. Based on a prototype scenario from the PLANTCockpit project, the motivation and the benefits are shown.
Keywords
IEC standards; data integration; distributed control; enterprise resource planning; industrial control; ERP level; IEC 61499 function block concept; MES level; PLANTCockpit project; control system; control system layer; enterprise layer; function interconnection; functional integration; industrial automation system; vertical data integration; Automation; Computer architecture; Control systems; IEC standards; Informatics; Real time systems;
fLanguage
English
Publisher
ieee
Conference_Titel
Factory Communication Systems (WFCS), 2012 9th IEEE International Workshop on
Conference_Location
Lemgo
ISSN
Pending
Print_ISBN
978-1-4673-0693-5
Type
conf
DOI
10.1109/WFCS.2012.6242551
Filename
6242551
Link To Document