DocumentCode :
2648936
Title :
Optimal maintenance policies during the post-warranty period for second-hand item
Author :
Kim, Dae-Kyung ; Lim, Jae-Hak ; Park, Dong-Ho
Author_Institution :
Dept. of Stat., Chonbuk Nat. Univ., Chonju, South Korea
fYear :
2011
fDate :
17-19 June 2011
Firstpage :
446
Lastpage :
450
Abstract :
This paper studies the optimal periodic PM policies of a second-hand item following the expiration of warranty. The criterion used to determine the optimality of the PM is the expected maintenance cost rate per unit time from the customer´s perspective. The periodic PM of the item starts right after the warranty is expired and all maintenance costs are paid by the customer. Given the cost structures of maintaining the item, we determine the optimal number of PM´s before replacing the item by a new one and the optimal length of period for the periodic PM following the expiration of warranty.
Keywords :
maintenance engineering; warranties; maintenance costs; optimal maintenance policies; optimal periodic PM policies; post-warranty period; second-hand item; Contracts; Optimization; Preventive maintenance; Reliability engineering; Safety; Warranties; expected maintenance cost rate per unit time; preventive maintenance; renewing free-replacement warranty; renewing pro-rata warranty; warranty;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Quality, Reliability, Risk, Maintenance, and Safety Engineering (ICQR2MSE), 2011 International Conference on
Conference_Location :
Xi´an
Print_ISBN :
978-1-4577-1229-6
Type :
conf
DOI :
10.1109/ICQR2MSE.2011.5976649
Filename :
5976649
Link To Document :
بازگشت