• DocumentCode
    2650260
  • Title

    Model on evaluating operational readiness of equipment group for depot-level maintenance

  • Author

    Li, Tao ; Xu, Ying ; Wang, Xian-Wen

  • Author_Institution
    Dept. of Equip. Command & Manage., Mech. Eng. Coll., Shijiazhuang, China
  • fYear
    2011
  • fDate
    17-19 June 2011
  • Firstpage
    754
  • Lastpage
    757
  • Abstract
    The force of depot-level maintenance is essential to improve equipment operational readiness rapidly. And through analysis the structure of depot-level maintenance and the working requirements, consider spare fill rate, replacement of repair time and supply time influence for operational readiness, and puts forward the proper evaluating model. Through an example to illustrate the validity of the evaluating model and the various factors influence extent of operational readiness.
  • Keywords
    maintenance engineering; military equipment; depot-level maintenance; equipment group; equipment operational readiness; evaluating model; repair time replacement; spare fill rate; supply time influence; working requirements; Analytical models; Atmospheric modeling; Distribution functions; Exponential distribution; Maintenance engineering; Markov processes; depot-level; equipment group; operational readiness; spare fill rate;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Quality, Reliability, Risk, Maintenance, and Safety Engineering (ICQR2MSE), 2011 International Conference on
  • Conference_Location
    Xi´an
  • Print_ISBN
    978-1-4577-1229-6
  • Type

    conf

  • DOI
    10.1109/ICQR2MSE.2011.5976719
  • Filename
    5976719