• DocumentCode
    2651581
  • Title

    Calculating Total Cycle Time of Supply Chain Based on Markov Chain

  • Author

    Fu Qiu-fang ; Zhi-yong, Zhang

  • Author_Institution
    Guangdong Univ. of Foreign Studies, Guangzhou
  • fYear
    2007
  • fDate
    20-22 Aug. 2007
  • Firstpage
    928
  • Lastpage
    933
  • Abstract
    After time-based competition was put forward in 1988, total cycle time has long been recognized as an important metric for assessing the performance and competitiveness of a supply chain. Total cycle time management paradigm of supply chain is a managerial philosophy. Total cycle time management seeks to reduce total time required to perform all the activities that occur in the entire supply chain. Goods flow process in supply chain is analyzed, finding that it has the Markov property. In this paper, a Markov chain model is developed for calculating and managing the total cycle time of supply chain. It can identify the activities that represent the largest components of total cycle time. Those activities are then targeted for cycle time reduction. Furthermore, an example was given, and finally observations are made.
  • Keywords
    Markov processes; supply chains; Markov chain model; goods flow process; supply chain; total cycle time management; Communications technology; Companies; Conference management; Consumer electronics; Delay; Engineering management; Internet; Supply chain management; Supply chains; Technology management; calculating total cycle time; supply chain; time-based competition; total cycle time management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management Science and Engineering, 2007. ICMSE 2007. International Conference on
  • Conference_Location
    Harbin
  • Print_ISBN
    978-7-88358-080-5
  • Electronic_ISBN
    978-7-88358-080-5
  • Type

    conf

  • DOI
    10.1109/ICMSE.2007.4421965
  • Filename
    4421965