DocumentCode
2651581
Title
Calculating Total Cycle Time of Supply Chain Based on Markov Chain
Author
Fu Qiu-fang ; Zhi-yong, Zhang
Author_Institution
Guangdong Univ. of Foreign Studies, Guangzhou
fYear
2007
fDate
20-22 Aug. 2007
Firstpage
928
Lastpage
933
Abstract
After time-based competition was put forward in 1988, total cycle time has long been recognized as an important metric for assessing the performance and competitiveness of a supply chain. Total cycle time management paradigm of supply chain is a managerial philosophy. Total cycle time management seeks to reduce total time required to perform all the activities that occur in the entire supply chain. Goods flow process in supply chain is analyzed, finding that it has the Markov property. In this paper, a Markov chain model is developed for calculating and managing the total cycle time of supply chain. It can identify the activities that represent the largest components of total cycle time. Those activities are then targeted for cycle time reduction. Furthermore, an example was given, and finally observations are made.
Keywords
Markov processes; supply chains; Markov chain model; goods flow process; supply chain; total cycle time management; Communications technology; Companies; Conference management; Consumer electronics; Delay; Engineering management; Internet; Supply chain management; Supply chains; Technology management; calculating total cycle time; supply chain; time-based competition; total cycle time management;
fLanguage
English
Publisher
ieee
Conference_Titel
Management Science and Engineering, 2007. ICMSE 2007. International Conference on
Conference_Location
Harbin
Print_ISBN
978-7-88358-080-5
Electronic_ISBN
978-7-88358-080-5
Type
conf
DOI
10.1109/ICMSE.2007.4421965
Filename
4421965
Link To Document