    Slab Cluster Based Planning and Scheduling Method of CC-DHCR

  • Author

    Li, Sujian ; Liang, Helan ; Huang, Yanjun ; Hu, Bo

  • Author_Institution
    Dept. of Logistics Eng., Univ. of Sci. & Technol., Beijing
  • fYear
    2009
  • fDate
    22-24 Jan. 2009
  • Firstpage
    393
  • Lastpage
    396
  • Abstract
    Focusing on the limitations of the traditional CCDHCR scheduling methods that are in high planning complexity and rarely attack dynamic scheduling problem, a new CC-DHCR integrated planning and scheduling method base on slab cluster is put forward. The key idea is, on one hand, to classify slabs and coils into slab clusters and coil clusters respectively according to the slab and coil clustering rules in the batch planning layer, so as to improve the planing efficiency; On the other hand, to design slab cluster based strategy in the dynamic scheduling layer, based on which the sequences of entering the reheat furnace for slabs from the same slab cluster can be adjusted dynamically according to the actual production conditions. Results of test with data from practical production process show that the method can effectively solve the CC-DHCR scheduling problem, and increase the DHCR ratio.
  • Keywords
    metallurgical industries; milling; production planning; scheduling; slabs; CC-DHCR; batch planning layer; coil clusters; continuous caster; dynamic scheduling problem; hot strip mill; reheat furnace; slab cluster based planning; Coils; Continuous production; Dynamic scheduling; Furnaces; Process planning; Production planning; Slabs; Steel; Technology planning; Testing; CC-DHCR; Integrated Planning and Scheduling; Slab Cluster;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Computer Control, 2009. ICACC '09. International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-3330-8
  • Type

    conf

  • DOI
    10.1109/ICACC.2009.79
  • Filename
    4777373