• DocumentCode
    2655269
  • Title

    Fabrication processes for the PEP-II RF cavities

  • Author

    Franks, R.M. ; Rimmer, R.A. ; Schwarz, H.

  • Author_Institution
    Lawrence Livermore Nat. Lab., CA, USA
  • Volume
    3
  • fYear
    1997
  • fDate
    12-16 May 1997
  • Firstpage
    3007
  • Abstract
    This paper presents the major steps used in the fabrication of the 26 RF cavities required for the PEP-II B-factory. Several unique applications of conventional processes have been developed and successfully implemented: electron beam welding (EBW), with minimal porosity, of .75 inch (19 mm) copper cross-sections; extensive 5-axis milling of water channels; electroplating of .37 inch (10 mm) thick OFE copper; tuning of the cavity by profiling beam noses prior to final joining with the cavity body; and machining of the cavity interior, are described
  • Keywords
    accelerator RF systems; accelerator cavities; electron accelerators; electron beam welding; electroplating; machining; storage rings; tuning; 10 mm; 19 mm; Cu; OFE copper; PEP-II; RF cavities; electron beam welding; electroplating; fabrication; joining; machining; milling; tuning; water channels; Copper; Electron beams; Electronics cooling; Fabrication; Machining; Milling; Radio frequency; Shape control; Silver; Welding;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1997. Proceedings of the 1997
  • Conference_Location
    Vancouver, BC
  • Print_ISBN
    0-7803-4376-X
  • Type

    conf

  • DOI
    10.1109/PAC.1997.753090
  • Filename
    753090