DocumentCode :
2655746
Title :
Beam test of a superconducting damped cavity for KEKB
Author :
Furuya, T. ; Akai, K. ; Asano, K. ; Ezura, E. ; Hara, K. ; Hosoyama, K. ; Kabe, A. ; Kojima, Y. ; Mitsunobu, S. ; Morita, Y. ; Nakai, H. ; Nakanishi, H. ; Tajima, T. ; Takahashi, T. ; Yoshimoto, S. ; Zhao, S. ; Ishi, Y. ; Kijima, Y. ; Murai, T. ; Sennyu,
Author_Institution :
KEK, Tsukuba, Japan
Volume :
3
fYear :
1997
fDate :
12-16 May 1997
Firstpage :
3087
Abstract :
For the feasibility study of a superconducting damped cavity for a KEK B-factory, a prototype module was constructed and tested in the TRISTAN Accumulation Ring. This module accelerated the beam current of 500 mA with the cavity voltage of 1-2 MV, and 350 mA with 2.5 MV (10.3 MV/m). These currents were limited by heating up of other ring components. The peak current of 573 mA was achieved in 16 bunches with 1.2 MV
Keywords :
accelerator cavities; electron accelerators; storage rings; superconducting cavity resonators; 1 to 2 MV; 2.5 MV; KEK B-factory; KEKB; TRISTAN Accumulation Ring; beam current; bunches; cavity voltage; peak current; superconducting damped cavity; Acceleration; Assembly; Cooling; Damping; Optical coupling; Particle beams; Prototypes; Radio frequency; Testing; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location :
Vancouver, BC
Print_ISBN :
0-7803-4376-X
Type :
conf
DOI :
10.1109/PAC.1997.753117
Filename :
753117
Link To Document :
بازگشت