• DocumentCode
    2656310
  • Title

    Summary of the link calibration between NIM and PTB using a traveling GPS receiver

  • Author

    Liang, Kun ; Feldmann, Thorsten ; Bauch, Andreas ; Piester, Dirk ; Zhang, Aimin ; Gao, Xiaoxun

  • Author_Institution
    Nat. Inst. of Metrol. (NIM), Beijing, China
  • fYear
    2011
  • fDate
    2-5 May 2011
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The time transfer link between NIM and PTB was for the first time calibrated using a travelling GPS receiver developed by NIM. The calibration uncertainty was estimated to about 2 ns. The result obtained could be compared to the result derived from differential calibrations made by BIPM in previous years. Both results agree well within 1 ns.
  • Keywords
    Global Positioning System; calibration; radio receivers; BIPM; NIM; PTB; differential calibrations; link calibration; traveling GPS receiver; Calibration; Charge coupled devices; Delay; Global Positioning System; Receivers; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Frequency Control and the European Frequency and Time Forum (FCS), 2011 Joint Conference of the IEEE International
  • Conference_Location
    San Fransisco, CA
  • ISSN
    1075-6787
  • Print_ISBN
    978-1-61284-111-3
  • Type

    conf

  • DOI
    10.1109/FCS.2011.5977281
  • Filename
    5977281