• DocumentCode
    2660126
  • Title

    Risk assessment: a tool for improving power reliability in central offices

  • Author

    Popp, W.J.

  • Author_Institution
    Southwestern Bell Telephone Co., St. Louis, MO, USA
  • fYear
    1996
  • fDate
    6-10 Oct 1996
  • Firstpage
    209
  • Lastpage
    212
  • Abstract
    The authors argue that the risk assessment process provides a viable means to manage power improvement in central office buildings. As used by the Southwestern Bell Telephone Company (SWBT), it is providing a tool to focus resources for maximum benefit and demonstrate the results of corrective actions. Risk assessment results also provide meaningful data for communicating with decision-makers where actual data may not be available or take considerable time to collect
  • Keywords
    distribution networks; power supply quality; power system reliability; risk management; Southwestern Bell Telephone Company; central office buildings; corrective actions; power reliability; risk assessment process; Batteries; Central office; Data engineering; FCC; Intelligent networks; Power system reliability; Risk management; Telecommunication network reliability; Telephony; Total quality management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Telecommunications Energy Conference, 1996. INTELEC '96., 18th International
  • Conference_Location
    Boston, MA
  • Print_ISBN
    0-7803-3507-4
  • Type

    conf

  • DOI
    10.1109/INTLEC.1996.572405
  • Filename
    572405