DocumentCode
2665700
Title
Mechanized assembly of multichip modules
Author
Evans, Daniel D. ; Hoffman, Robert H. ; Hueners, Bruce W.
Author_Institution
Hughes Aircraft Co., Carlsbad, CA, USA
fYear
1993
fDate
4-6 Oct 1993
Firstpage
262
Lastpage
270
Abstract
Competitive matrices are valuable to illustrate where each product stands in relation to satisfying an end-user´s requirements. Categories in a competitive matrix may include: (1) customer support - the cost of downtime is high and processes are increasingly more complex; (2) uptime related issues including mean-time-to-repair, mean-time-to-failure, parts availability and service skills; (3) performance - the ability to perform the required function, and (4) upgrade ability - the ongoing utility of the equipment as production requirements change
Keywords
assembling; computer integrated manufacturing; microassembling; multichip modules; competitive matrix; computer integrated manufacturing interface; customer support; dispensing; downtime cost; mean-time-to-failure; mean-time-to-repair; mechanised assembly; multichip modules; parts availability; performance; pick and place parameters; position control; service skills; upgrade ability; uptime related issues; Assembly; Automatic control; Chip scale packaging; Computerized monitoring; Costs; Flip chip; Manufacturing automation; Multichip modules; Packaging machines; Production facilities;
fLanguage
English
Publisher
ieee
Conference_Titel
Electronic Manufacturing Technology Symposium, 1993, Fifteenth IEEE/CHMT International
Conference_Location
Santa Clara, CA
Print_ISBN
0-7803-1424-7
Type
conf
DOI
10.1109/IEMT.1993.398193
Filename
398193
Link To Document