DocumentCode
2666446
Title
Return to service time evaluation model
Author
Sinickas, D. ; Plestys, R.
Author_Institution
Comput. Network, Kaunas Univ. of Technol.
fYear
0
fDate
0-0 0
Firstpage
651
Lastpage
656
Abstract
The objective of this work is to estimate the dependency of the service recovery time on the enterprise technology services´ number, probabilities of their participation in repair and the duration of their participation in fault elimination, when the services participate in the repair process in sequence
Keywords
business communication; commerce; probability; telecommunication network reliability; telecommunication services; enterprise technology service number; fault elimination; probability; repair process; service recovery time dependency; service time evaluation model; Air conditioning; Computer networks; Concrete; Logistics; Manufacturing systems; Power cables; Power supplies; Probability distribution; Resumes; Steady-state;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Technology Interfaces, 2006. 28th International Conference on
Conference_Location
Cavtat/Dubrovnik
ISSN
1330-1012
Print_ISBN
953-7138-05-4
Type
conf
DOI
10.1109/ITI.2006.1708557
Filename
1708557
Link To Document