• DocumentCode
    2666446
  • Title

    Return to service time evaluation model

  • Author

    Sinickas, D. ; Plestys, R.

  • Author_Institution
    Comput. Network, Kaunas Univ. of Technol.
  • fYear
    0
  • fDate
    0-0 0
  • Firstpage
    651
  • Lastpage
    656
  • Abstract
    The objective of this work is to estimate the dependency of the service recovery time on the enterprise technology services´ number, probabilities of their participation in repair and the duration of their participation in fault elimination, when the services participate in the repair process in sequence
  • Keywords
    business communication; commerce; probability; telecommunication network reliability; telecommunication services; enterprise technology service number; fault elimination; probability; repair process; service recovery time dependency; service time evaluation model; Air conditioning; Computer networks; Concrete; Logistics; Manufacturing systems; Power cables; Power supplies; Probability distribution; Resumes; Steady-state;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Technology Interfaces, 2006. 28th International Conference on
  • Conference_Location
    Cavtat/Dubrovnik
  • ISSN
    1330-1012
  • Print_ISBN
    953-7138-05-4
  • Type

    conf

  • DOI
    10.1109/ITI.2006.1708557
  • Filename
    1708557