Title :
An optimization model for flexible routing based flowshop scheduling problem
Author :
Wang, Qing ; Wang, Fan ; Liu, Shu-an ; Qi, Yanhui
Author_Institution :
Inf. Sci. & Eng. Coll., Northeastern Univ., Shenyang, China
Abstract :
The complication of quartz process leads to the difficulty of its production scheduling. This paper models the scheduling in quartz production as a flexible routing based flowshop scheduling problem with two objectives. Each job may have one or more process routes, i.e., a job operation may choose one equipment or skilled worker among a set of qualified ones with same function but perhaps with different processing speed or costs. The proposed model is a mixed-integer program: processing costs and tardiness charges. A dedicated Genetic Algorithm is designed with heuristics mechanism to solve the model. The simulated computation shows that the proposed model and the algorithm are feasible and effective for the flexible routing based flowshop scheduling problem.
Keywords :
flow shop scheduling; genetic algorithms; integer programming; quartz; flexible routing based flowshop scheduling problem; genetic algorithm; heuristics mechanism; job operation; mixed-integer program; optimization model; processing costs; processing speed; production scheduling; quartz production; simulated computation; tardiness charges; Biological cells; Computational modeling; Genetic algorithms; Job shop scheduling; Optimization; Routing; Genetic Algorithm; Hybrid Flowshop; Production Scheduling;
Conference_Titel :
Control and Decision Conference (CCDC), 2012 24th Chinese
Conference_Location :
Taiyuan
Print_ISBN :
978-1-4577-2073-4
DOI :
10.1109/CCDC.2012.6244320