DocumentCode :
2670927
Title :
Research on ROI of BT project based on Singel-factor APT model
Author :
Gao, Hua ; Wang, Li-juan
Author_Institution :
Manage. Sch., Tianjin Univ. of Technol., Tianjin, China
fYear :
2010
fDate :
17-19 Sept. 2010
Firstpage :
841
Lastpage :
843
Abstract :
ROI of BT projects is involved in the benefit distribution and risk allocation between BT project initiator (local government or local governmental branch) and BT project investor and constractor (the private sector), and is related to the success or failure of BT projects. Up to now, the government departments have not promulgated laws or regulations about how to make sure ROI of BT project. So how to make sure ROI of BT project becomes the problem in the negotiation of BT project. Starting from international practice, the thesis sets down ROI of BT project in reference on Singel-factor APT model.
Keywords :
investment; project management; set theory; BT project constractor; BT project initiator; BT project investor; benefit distribution; build-transfer; risk allocation; singel factor APT model; thesis sets; Biological system modeling; Contracts; Force; Investments; Probability; Sensitivity; Shape; BT(Build-Transfer) mode; ROI(Return of investment); Singel-factor APT model Introduction;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information and Financial Engineering (ICIFE), 2010 2nd IEEE International Conference on
Conference_Location :
Chongqing
Print_ISBN :
978-1-4244-6927-7
Type :
conf
DOI :
10.1109/ICIFE.2010.5609486
Filename :
5609486
Link To Document :
بازگشت