    Study on the integrated risk management mode of distance transmission pipeline construction projects

  • Author

    Zhang, Qing

  • Author_Institution
    China Univ. of Geosci., Wuhan, China
  • fYear
    2010
  • fDate
    17-19 Sept. 2010
  • Firstpage
    886
  • Lastpage
    889
  • Abstract
    The paper systematically combed the EPC mode pipeline risk management process, established a risk management system, with some guidance and strong operational, available pipeline construction project risk management practice, after Pipeline EPC project risk management will be a great reference value. Research ideas and analysis on the EPC general contract project risk management, and other modes of long-distance pipeline risk management, have some reference.
  • Keywords
    pipelines; project management; risk management; distance transmission pipeline construction projects; risk management; Book reviews; Monitoring; Petroleum; Pipelines; Risk management; Schedules; Pipeline; integrated management; risk;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information and Financial Engineering (ICIFE), 2010 2nd IEEE International Conference on
  • Conference_Location
    Chongqing
  • Print_ISBN
    978-1-4244-6927-7
  • Type

    conf

  • DOI
    10.1109/ICIFE.2010.5609495
  • Filename
    5609495