DocumentCode :
2671091
Title :
Study on the integrated risk management mode of distance transmission pipeline construction projects
Author :
Zhang, Qing
Author_Institution :
China Univ. of Geosci., Wuhan, China
fYear :
2010
fDate :
17-19 Sept. 2010
Firstpage :
886
Lastpage :
889
Abstract :
The paper systematically combed the EPC mode pipeline risk management process, established a risk management system, with some guidance and strong operational, available pipeline construction project risk management practice, after Pipeline EPC project risk management will be a great reference value. Research ideas and analysis on the EPC general contract project risk management, and other modes of long-distance pipeline risk management, have some reference.
Keywords :
pipelines; project management; risk management; distance transmission pipeline construction projects; risk management; Book reviews; Monitoring; Petroleum; Pipelines; Risk management; Schedules; Pipeline; integrated management; risk;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information and Financial Engineering (ICIFE), 2010 2nd IEEE International Conference on
Conference_Location :
Chongqing
Print_ISBN :
978-1-4244-6927-7
Type :
conf
DOI :
10.1109/ICIFE.2010.5609495
Filename :
5609495
Link To Document :
بازگشت