• DocumentCode
    2673562
  • Title

    Simulation model for discharging a lead-acid battery energy storage system for load leveling

  • Author

    Papic, Igor

  • Author_Institution
    Fac. of Electr. Eng., Ljubljana Univ.
  • fYear
    0
  • fDate
    0-0 0
  • Abstract
    Summary form only given. A battery energy storage system - BESS stores energy at lower demand and sends saved energy back to the system during peak load. It thus represents a good solution for daily load leveling. The evaluation of the ampere-hour capacity of the battery needed for load leveling during a period of several hours is of great importance when using BESS as an active power peaking station. A battery simulation model that was developed for this purpose is presented in the paper. The model takes into account the battery voltage dependency on the capacity and current, and is based on the performed battery measurements at constant discharging currents. By using the mentioned model, which should prove to be a very effective tool for BESS capacity planning, the simulation of the characteristic load leveling was performed and compared to the measured voltage and current profiles
  • Keywords
    battery storage plants; energy storage; lead acid batteries; load (electric); BESS; active power peaking station; ampere-hour capacity; battery energy storage system; battery measurements; battery voltage dependency; capacity planning; constant discharging currents; current profiles measurement; discharging; lead-acid battery; load leveling; voltage profiles measurement; Battery charge measurement; Capacity planning; Current measurement; Energy storage; Performance evaluation; Power system modeling; Voltage measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2006. IEEE
  • Conference_Location
    Montreal, Que.
  • Print_ISBN
    1-4244-0493-2
  • Type

    conf

  • DOI
    10.1109/PES.2006.1708971
  • Filename
    1708971