• DocumentCode
    2675384
  • Title

    ESKOM experiences in the application and implementation of remote area power supply (RAPS) projects

  • Author

    Ligoff, D.

  • Author_Institution
    ESKOM Nat. Pricing Policy, Johannesburg, South Africa
  • fYear
    1992
  • fDate
    22-24 Sep 1992
  • Firstpage
    225
  • Lastpage
    227
  • Abstract
    Eskom´s experiences in the application and implementation of RAPS projects have highlighted a number of issues. RAPS technologies work, and are capable of satisfying a multitude of customers´ energy needs. The high capital cost of RAPS systems, in return for what is perceived to be a limited power supply, is still the greatest obstacle preventing wider utilization of these technologies. Inadequate communication with the customer in terms of understanding his energy needs, system limitations, and basic energy management has lead to disillusionment among many existing RAPS customers. This has damaged the image of both the RAPS industry and the associated technologies. A necessary component of any RAPS programme is customer education and a reliable maintenance and backup service infrastructure
  • Keywords
    power supplies to apparatus; ESKOM; South Africa; application; capital cost; customer; education; energy management; energy needs; experiences; implementation; maintenance; projects; remote area power supply; Africa; Costs; Finance; Photovoltaic systems; Power engineering and energy; Power supplies; Pricing; Solar power generation; System performance; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    AFRICON '92 Proceedings., 3rd AFRICON Conference
  • Conference_Location
    Ezulwini Valley
  • Print_ISBN
    0-7803-0835-2
  • Type

    conf

  • DOI
    10.1109/AFRCON.1992.624460
  • Filename
    624460