DocumentCode
2675384
Title
ESKOM experiences in the application and implementation of remote area power supply (RAPS) projects
Author
Ligoff, D.
Author_Institution
ESKOM Nat. Pricing Policy, Johannesburg, South Africa
fYear
1992
fDate
22-24 Sep 1992
Firstpage
225
Lastpage
227
Abstract
Eskom´s experiences in the application and implementation of RAPS projects have highlighted a number of issues. RAPS technologies work, and are capable of satisfying a multitude of customers´ energy needs. The high capital cost of RAPS systems, in return for what is perceived to be a limited power supply, is still the greatest obstacle preventing wider utilization of these technologies. Inadequate communication with the customer in terms of understanding his energy needs, system limitations, and basic energy management has lead to disillusionment among many existing RAPS customers. This has damaged the image of both the RAPS industry and the associated technologies. A necessary component of any RAPS programme is customer education and a reliable maintenance and backup service infrastructure
Keywords
power supplies to apparatus; ESKOM; South Africa; application; capital cost; customer; education; energy management; energy needs; experiences; implementation; maintenance; projects; remote area power supply; Africa; Costs; Finance; Photovoltaic systems; Power engineering and energy; Power supplies; Pricing; Solar power generation; System performance; Systems engineering and theory;
fLanguage
English
Publisher
ieee
Conference_Titel
AFRICON '92 Proceedings., 3rd AFRICON Conference
Conference_Location
Ezulwini Valley
Print_ISBN
0-7803-0835-2
Type
conf
DOI
10.1109/AFRCON.1992.624460
Filename
624460
Link To Document