DocumentCode
2675917
Title
The feasibility of supplying a large, sparsely loaded area at 22 kV
Author
Williamson, A.R.F. ; van der Merwe, W.C. ; le Roes, G.S.
Author_Institution
ESKOM, Johannesburg, South Africa
fYear
1992
fDate
22-24 Sep 1992
Firstpage
240
Lastpage
242
Abstract
The results of transient and steady-state studies into the feasibility of an extended 22 kV distribution system are presented. The study relates to the need to supply farming communities on the Molopo River with electricity. The feasibility of using the existing Wessels 66 kV/22 kV substation was investigated. The proposed scheme requires a 22 kV backbone of over 300 km, and tee-offs which bring the total length of line to over 1000 km. The installed capacity will be approximately 4 MVA, but the anticipated maximum demand is only one third of this figure. All studies were performed using the PSS/U program of Power Technologies Incorporated, running on an IBM PC-AT. It is concluded that, provided the loading of the system is neither too low nor too high, the system will perform adequately
Keywords
distribution networks; 22 kV; 4 MVA; 66 kV; Computer Simulation; IBM PC-AT; PSS/U program; South Africa; backbone; distribution system; farming communities; feasibility; installed capacity; loading; maximum demand; power systems planning; rural power supply; steady-state; tee-offs; transient; Africa; Conductors; Costs; Regulators; Rivers; Spine; Steady-state; Substations; Surges; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
AFRICON '92 Proceedings., 3rd AFRICON Conference
Conference_Location
Ezulwini Valley
Print_ISBN
0-7803-0835-2
Type
conf
DOI
10.1109/AFRCON.1992.624463
Filename
624463
Link To Document