• DocumentCode
    2676647
  • Title

    System integration of large-scale wind power in the Netherlands

  • Author

    Ummels, B.C. ; Gibescu, M. ; Pelgrum, E. ; Kling, W.L.

  • Author_Institution
    Electr. Power Syst. Groups, Delft Univ. of Technol.
  • fYear
    0
  • fDate
    0-0 0
  • Abstract
    This paper presents the results of a simulation of system operation in the Netherlands in the presence of future large-scale wind energy production. The study is aimed at identifying bottlenecks in system planning and operation due to wind integration, in particular base-load and ramp rate problems. These may constraint the amount of wind that can be accommodated given a projected production park of dispatchable units and yearly load profile by 2012. Wind data from 2004-2005, interpolated to existing locations for onshore and planned locations for offshore wind parks, were used to create a realistic yearly wind energy output profile. The unit commitment and economic dispatch formulation includes ramp rate constraints for generation schedules and reserve activation as well as minimum up- and down times. Of particular interest in this study are the combined heat & power (CHP) units, which impose additional constraints coupling their heat and energy production. Since no insight was available into the aggregated predictability of wind generation, both a 0-MW prediction, where conventional units are scheduled to meet the total load, and a perfect prediction have been investigated. No forms of electrical or heat storage were considered. The results show no ramp rate problems in the Dutch system by 2012, however base-load problems may arise at high wind penetration levels, only to be prevented by wasting available wind resources
  • Keywords
    cogeneration; power generation dispatch; power generation economics; power generation planning; power generation scheduling; wind power plants; CHP units; Netherlands; economic dispatch formulation; generation schedules; large-scale wind energy production; large-scale wind power; offshore wind parks; ramp rate constraints; unit commitment; wind energy output profile; wind integration; Cogeneration; Economic forecasting; Large scale integration; Large-scale systems; Power generation economics; Power system planning; Production systems; Wind energy; Wind energy generation; Wind forecasting;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2006. IEEE
  • Conference_Location
    Montreal, Que.
  • Print_ISBN
    1-4244-0493-2
  • Type

    conf

  • DOI
    10.1109/PES.2006.1709154
  • Filename
    1709154