DocumentCode :
2678741
Title :
Vectren´s Experience with Operating Genco Assets in MISO Market
Author :
Lisembee, Brad ; Morris, Kevin
Author_Institution :
Vectren, Evansville, Indiana
fYear :
2006
fDate :
18-22 June 2006
Firstpage :
1
Lastpage :
1
Abstract :
This paper summarizes Vectren´s experience with operating generation assets in the MISO Day-2 market. The paper will address the following topics: ■ Forecasting day-ahead loads and LMPs ■ Evaluation of day-ahead bidding strategies ■ Reviewing offer data to make sure that they pass market-mitigation tests ■ Developing strategies for deciding when to offer units as must run vs. economic. ■ Post-analyzing day-ahead strategies to check whether SCUC schedules are optimal for Vectren ■ Formulating methods for pricing combustion turbines ■ Working with RTO to resolve problems with real-time dispatch, causing LMP oscillations and large LMP spikes ■ Management of settlement disputes
Keywords :
Combustion; Economic forecasting; Load forecasting; Power generation; Power generation economics; Pricing; Testing; Turbines;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2006. IEEE
Print_ISBN :
1-4244-0493-2
Type :
conf
DOI :
10.1109/PES.2006.1709271
Filename :
1709271
Link To Document :
بازگشت