DocumentCode
2682486
Title
Reliability unit commitment in ERCOT
Author
Whittle, Brandon ; Yu, Jun ; Teng, Shuye ; Mickey, Joel
Author_Institution
Electr. Reliability Council of Texas, TX
fYear
0
fDate
0-0 0
Abstract
An overview of ERCOT´s background and the ERCOT RUC process is presented. The three steps of clearing the ERCOT RPRS Market are described. Settlements of the RPRS market are briefly described. Finally, several typical challenges with RUC in ERCOT are briefly discussed
Keywords
power generation dispatch; power generation reliability; power generation scheduling; power markets; ERCOT; reliability unit commitment; replacement reserve service market; Cost function; Councils; Economic forecasting; Engines; Portfolios; Power generation economics; Power system modeling; Power system reliability; Procurement; Transmission lines; Reliability Unit Commitment;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2006. IEEE
Conference_Location
Montreal, Que.
Print_ISBN
1-4244-0493-2
Type
conf
DOI
10.1109/PES.2006.1709490
Filename
1709490
Link To Document