DocumentCode :
2684752
Title :
Technical solutions for pre-payment metering systems for Southern Africa
Author :
Gray, Rod T.
Author_Institution :
ESKOM, Johannesburg, South Africa
fYear :
1992
fDate :
22-24 Sep 1992
Firstpage :
537
Lastpage :
540
Abstract :
The authors describes Eskom´s contribution to the local development of prepayment metering systems for the specific conditions encountered in Southern Africa. Over the next five to seven years 750,000 prepayment metering systems will be installed in South Africa by Eskom. The overall goal of 3,000,000 prepayment systems will be installed together with other bodies over this period. It is concluded that the concept of prepayment of electricity is technically acceptable to most customers and in fact preferable for many. However, an acceptable level of customer service is essential for its success. The performance of the prepayment systems is proving to be acceptable
Keywords :
electricity supply industry; Eskom; Southern Africa; customer service; electricity supply; installation; performance; pre-payment metering systems; Africa; Communication standards; Costs; IEC standards; Manufacturing; Marketing and sales; Personnel; Standards development; Standards publication; System testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
AFRICON '92 Proceedings., 3rd AFRICON Conference
Conference_Location :
Ezulwini Valley
Print_ISBN :
0-7803-0835-2
Type :
conf
DOI :
10.1109/AFRCON.1992.624540
Filename :
624540
Link To Document :
بازگشت