Title :
Analysis of multi-functional support equipment failure impacting on maintenance waiting time
Author :
Wang, Yan ; Ma, Lin ; Guo, Linhan ; Kang, Rui
Author_Institution :
Dept of Reliability & Syst. Eng., Beihang Univ., Beijing, China
Abstract :
In order to analyze the impact of multi-functional support equipment failure, tasks of multi-functional support equipment during maintenance process were described, and maintenance plan of multi-functional support equipment was taken into consideration. Maintenance support process model considering multi-functional support equipment failure was put forward, and thereafter a simulation model was built up. Based on the model, analysis of impact which results from quantity and mean-time-between-failures (MTBF) of multifunctional support equipment on maintenance waiting time were carried out. The article provides a useful method for carrying out logistics of multi-functional support equipment and puts forward multi-functional support equipment reliability parameters.
Keywords :
failure analysis; logistics; maintenance engineering; process planning; production equipment; reliability; equipment reliability; logistics; maintenance planning; maintenance support process model; maintenance waiting time; mean-time-between-failures model; multifunctional support equipment failure analysis; Analytical models; Atmospheric modeling; Data models; Logistics; Maintenance engineering; Reliability engineering; System engineering; logistics; multi-functional support equipment failure; reliability; simulation;
Conference_Titel :
Reliability, Maintainability and Safety (ICRMS), 2011 9th International Conference on
Conference_Location :
Guiyang
Print_ISBN :
978-1-61284-667-5
DOI :
10.1109/ICRMS.2011.5979381