Abstract
With the integration of Romania into the European Union, the Romanian Power Grid Company TR4NSELECTRICA integrated in the year 2004 at the U.C.T.E. through the Electrical Substation 400/220 kV Rosiori (Romania) connected to the Electrical Substation 400/220 kV Mucacevo (Ukraine) and the Electrical Substation 400/220 kV Arad (Romania) connected to the Electrical Substation 400 kV Sandorfalva (Hungary). These over head lines and electrical substations were retechnologized in order to synchronies the Western Europe with the Eastern Europe. The retechnologization of the over head lines and electrical substation had the goal of improving the quality of the electrical power transported according to the U.C.T.E. standards.
Keywords
power grids; power overhead lines; standards; substations; Arad; Eastern European region; Hungary; Mucacevo; Romanian Power Grid Company; Rosiori; Sandorfalva; TR4NSELECTRICA; UCTE standards; Ukraine; electrical power; electrical substations; over head lines; Coupling circuits; Europe; Fluctuations; Integrated circuit interconnections; Power generation; Power grids; Power quality; Power system interconnection; Shape; Substations; European integration; The Union for the Coordination of Transmission of Energy - U.C.T.E.; electrical power quality; international interconexions;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Power Quality and Utilisation, 2007. EPQU 2007. 9th International Conference on
Conference_Location
Barcelona
Print_ISBN
978-84-690-9441-9
Electronic_ISBN
978-84-690-9441-9
Type
conf
DOI
10.1109/EPQU.2007.4424120
Filename
4424120
Link To Document