Title :
Electrical power, quality improvement in the Eastern European Region
Author :
FITA, Daniel Nicolae ; MURESAN, Loredan ; BORZ, Rares Tiberiu
Author_Institution :
Tech. Univ. of Cluj Napoca, Cluj Napoca
Abstract :
With the integration of Romania into the European Union, the Romanian Power Grid Company TR4NSELECTRICA integrated in the year 2004 at the U.C.T.E. through the Electrical Substation 400/220 kV Rosiori (Romania) connected to the Electrical Substation 400/220 kV Mucacevo (Ukraine) and the Electrical Substation 400/220 kV Arad (Romania) connected to the Electrical Substation 400 kV Sandorfalva (Hungary). These over head lines and electrical substations were retechnologized in order to synchronies the Western Europe with the Eastern Europe. The retechnologization of the over head lines and electrical substation had the goal of improving the quality of the electrical power transported according to the U.C.T.E. standards.
Keywords :
power grids; power overhead lines; standards; substations; Arad; Eastern European region; Hungary; Mucacevo; Romanian Power Grid Company; Rosiori; Sandorfalva; TR4NSELECTRICA; UCTE standards; Ukraine; electrical power; electrical substations; over head lines; Coupling circuits; Europe; Fluctuations; Integrated circuit interconnections; Power generation; Power grids; Power quality; Power system interconnection; Shape; Substations; European integration; The Union for the Coordination of Transmission of Energy - U.C.T.E.; electrical power quality; international interconexions;
Conference_Titel :
Electrical Power Quality and Utilisation, 2007. EPQU 2007. 9th International Conference on
Conference_Location :
Barcelona
Print_ISBN :
978-84-690-9441-9
Electronic_ISBN :
978-84-690-9441-9
DOI :
10.1109/EPQU.2007.4424120