• DocumentCode
    2686018
  • Title

    Optimization method for spare parts deployment efficiency in development phase

  • Author

    Wang, Yan ; Ma, Lin ; Zhang, Zhenying ; Huang, Zhaodong

  • Author_Institution
    Dept of Reliability & Syst. Eng., Beihang Univ., Beijing, China
  • fYear
    2011
  • fDate
    12-15 June 2011
  • Firstpage
    1218
  • Lastpage
    1223
  • Abstract
    Based on the definition of spare parts deployment efficiency, factors influencing of deployment efficiency were analyzed; spare parts fill rate and utilization rate were introduced for measuring spare parts deployment efficiency. Spare parts utilization rate was calculated using Closed Jackson Queuing networks, while spare fill rate was figured out using Dynamic equilibrium equation of Logistics. With fill rate, utilization rate and cost being as constrains, optimization model of spare parts deployment efficiency was established. With SUMT which transform constrain problem to minimum question, combining horizontal search; iterate in the feasible region, optimized point can be figured out. The method will provide a new way to increase spare parts deployment efficiency.
  • Keywords
    logistics; maintenance engineering; optimisation; queueing theory; closed Jackson queuing network; horizontal search; logistics dynamic equilibrium equation; optimization model; spare parts deployment efficiency; spare parts development phase; spare parts fill rate; utilization rate; Delay; Exponential distribution; Logistics; Maintenance engineering; Optimization; Servers; Transportation; SUMT; logistics; optimization; spare parts deployment efficiency; system engineering;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reliability, Maintainability and Safety (ICRMS), 2011 9th International Conference on
  • Conference_Location
    Guiyang
  • Print_ISBN
    978-1-61284-667-5
  • Type

    conf

  • DOI
    10.1109/ICRMS.2011.5979455
  • Filename
    5979455