DocumentCode :
2686529
Title :
Ranking of components in a system for prioritisation of preventive replacement
Author :
Shen, Kecheng
Author_Institution :
Sch. of Mech. & Chem. Eng., Univ. of Western Australia, Perth, WA, Australia
fYear :
2011
fDate :
12-15 June 2011
Firstpage :
1365
Lastpage :
1369
Abstract :
Under suitable conditions, preventive replacement of components can be beneficial to reducing costly field failures. For a system, it is helpful to rank the components with respect to preventive replacement to prioritise the scheduling of these replacements. In this paper we propose a measure for such a ranking, which will take into account of the component´s reliability importance, the ratio between cost due to failure and cost due to preventive replacement and the reliability deterioration. Weibull distribution is considered for the components and two examples are provided to illustrate the methodology.
Keywords :
Weibull distribution; cost reduction; failure analysis; preventive maintenance; reliability; scheduling; Weibull distribution; component reliability; failures; preventive replacement; prioritisation; scheduling; Optimization; Preventive maintenance; Redundancy; Reliability engineering; Weibull distribution; Weibull failure time; coefficient of variation; cost ratio; failure cost; preventive replacement; reliability importance; replacement cost;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Reliability, Maintainability and Safety (ICRMS), 2011 9th International Conference on
Conference_Location :
Guiyang
Print_ISBN :
978-1-61284-667-5
Type :
conf
DOI :
10.1109/ICRMS.2011.5979483
Filename :
5979483
Link To Document :
بازگشت