• DocumentCode
    2689831
  • Title

    The Time-Optimal Planning and Execution problem

  • Author

    Allen, Thomas ; Scheding, Steven

  • Author_Institution
    Australian Centre for Field Robot., Univ. of Sydney, Sydney, NSW, Australia
  • fYear
    2011
  • fDate
    9-13 May 2011
  • Firstpage
    5608
  • Lastpage
    5614
  • Abstract
    This paper introduces the Time-Optimal Planning and Execution (TOPE) problem, in which the aim is to minimise the total planning and execution time required to achieve a goal. The TOPE process is derived and shown to be capable of solving this problem in dynamic state spaces, by continuously calculating the optimum value of any system parameters that can affect this total time. Procedures are presented to apply this process to an existing replanning system, and to determine its required accuracy and timeliness. It is shown that the TOPE process can yield lower total times than other planning systems if these requirements are met.
  • Keywords
    path planning; TOPE process; path planning; planning system; replanning system; time-optimal planning and execution; Accuracy; Equations; Estimation; Mathematical model; Path planning; Planning; Process control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation (ICRA), 2011 IEEE International Conference on
  • Conference_Location
    Shanghai
  • ISSN
    1050-4729
  • Print_ISBN
    978-1-61284-386-5
  • Type

    conf

  • DOI
    10.1109/ICRA.2011.5979708
  • Filename
    5979708