Title :
Integration of scheduling and routing for two-echelon supply chain system
Author :
Chen, Jen-Shiang ; Yang, Jin-Shan ; Lu, Chia-Lin
Author_Institution :
Dept. of Bus. Adm., Far East Univ., Tainan, Taiwan
Abstract :
Coordinating activities among supply, production, and delivery is an important issue for production and logistics management. In this study, a single machine scheduling model is developed that incorporated order release and delivery vehicle routing decisions which serves a single customer location. The objective is to minimize the makespan. The problem is NP-hard in the strong sense in general. Two integer programming models are developed to optimally solve this problem. Also, two efficient heuristics are proposed for solving large-sized problems. Computational results of the illustrative example are reported using the two integer programming models and two heuristics to solve the proposed problem.
Keywords :
integer programming; logistics; single machine scheduling; supply chains; NP-hard problems; heuristics programming; integer programming; logistics management; production management; single customer location; single machine scheduling; supply chain system; vehicle routing decisions; Job shop scheduling; Linear programming; Polynomials; Production; Routing; Single machine scheduling; Supply chain management; Supply chains; Transportation; Vehicles; Heuristic; Integer programming; Scheduling; Supply chain management;
Conference_Titel :
Service Systems and Service Management, 2009. ICSSSM '09. 6th International Conference on
Conference_Location :
Xiamen
Print_ISBN :
978-1-4244-3661-3
Electronic_ISBN :
978-1-4244-3662-0
DOI :
10.1109/ICSSSM.2009.5175017