Title :
Multi-objective particle swarm optimization algorithm for scheduling in flowshops to minimize makespan, total flowtime and completion time variance
Author :
Chandrasekaran, S. ; Ponnambalam, S.G. ; Suresh, R.K. ; Vijayakumar, N.
Author_Institution :
Sri Ramakrishna Mission Vidyalaya Polytech. Coll., Coimbatore
Abstract :
The present work deals with the development of particle swarm optimization algorithm to solve the multi-objective flowshop scheduling problem. In this paper, minimization of makespan, total flowtime and completion time variance are considered simultaneously. Performance of the proposed methodology has been tested by solving benchmark scheduling problems available in the literature. The proposed methodology is guided to search a set of non-dominated solutions close to the Pareto front. The search capability of the proposed PSO algorithm is enhanced using a local search mechanism. This work is a preliminary step in our research to identify the reference or Pareto solution sets for the benchmark FSPs proposed in the literature, when (Cmax), (tft) and (ctv) are to be simultaneously optimized.
Keywords :
Pareto optimisation; manufacturing systems; minimisation; particle swarm optimisation; scheduling; search problems; Pareto front; Pareto solution sets; completion time variance; flowshop scheduling; local search mechanism; makespan minimization; multiobjective particle swarm optimization algorithm; Evolutionary computation; Particle swarm optimization; Scheduling algorithm;
Conference_Titel :
Evolutionary Computation, 2007. CEC 2007. IEEE Congress on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-1339-3
Electronic_ISBN :
978-1-4244-1340-9
DOI :
10.1109/CEC.2007.4424994