Title :
Multi-objective optimization of flexible period preventive maintenance on a single machine
Author_Institution :
Sch. of Manage., Shanghai Univ. of Eng. Sci., Shanghai, China
Abstract :
Preventive maintenance (PM) plays a very important role in production process. In this paper, the optimization PM planning in finite time horizon for a single machine with minimal repair at failures is discussed. Not only two conflicting objectives of maintenance cost and maintenance time but also two constraints of the reliability and availability of the machine are simultaneously considered in the optimization problem. Three types of PM actions including replacement, repair and mechanical service are considered. In order to make the suiTABLE PM planning, flexible period PM strategy was proposed. In this strategy, the intervals between two coterminous PM actions were with a flexible range of choice. The multi-objective genetic algorithm is used to solve the flexible period PM optimization problem. Numerical case study shows that comparing with periodic PM strategy, flexible period PM strategy can save more maintenance cost and maintenance time.
Keywords :
costing; failure analysis; genetic algorithms; preventive maintenance; production planning; single machine scheduling; coterminous PM actions; failure analysis; finite time horizon; flexible period PM optimization problem; flexible period PM strategy; flexible period preventive maintenance; machine availability; machine reliability; maintenance cost; maintenance time; mechanical service; minimal repair; multiobjective genetic algorithm; multiobjective optimization; optimization PM planning; periodic PM strategy; production process; repair service; replacement service; single machine; Availability; Optimization; Planning; Preventive maintenance; Production; flexible period; multi-objective optimization; preventive maintenance;
Conference_Titel :
Quality, Reliability, Risk, Maintenance, and Safety Engineering (ICQR2MSE), 2012 International Conference on
Conference_Location :
Chengdu
Print_ISBN :
978-1-4673-0786-4
DOI :
10.1109/ICQR2MSE.2012.6246277