DocumentCode
2702371
Title
Research on contractor support delay time
Author
Cai, Liying ; Yang, Yanhong ; Liu, Zhanling ; Sun, Lei
Author_Institution
Ordnance Tech. Instn., Heibei Inst. of Phys. Educ., Shijiazhuang, China
fYear
2012
fDate
15-18 June 2012
Firstpage
1305
Lastpage
1308
Abstract
Equipment contractor support is the innovative practice and urgent requirement to promote new-type equipment forming operational and support capability. The support delay time is a significant discrimination between contractor support and Army support. As concerned breach of contract problem, the paper will take research on three kinds of support delay time: non-repair parts supply delay time, personnel delay time, facility and equipment delay time and breach of contract delay time.
Keywords
innovation management; military equipment; military systems; army support delay time; contractor support delay time; equipment contractor support; innovative practice; nonrepair parts supply delay time; personnel delay time; urgent requirement; Contracts; Delay; Logistics; Maintenance engineering; Personnel; Production facilities; Time factors; calculation model; contractor support; delay time;
fLanguage
English
Publisher
ieee
Conference_Titel
Quality, Reliability, Risk, Maintenance, and Safety Engineering (ICQR2MSE), 2012 International Conference on
Conference_Location
Chengdu
Print_ISBN
978-1-4673-0786-4
Type
conf
DOI
10.1109/ICQR2MSE.2012.6246461
Filename
6246461
Link To Document