• DocumentCode
    2702371
  • Title

    Research on contractor support delay time

  • Author

    Cai, Liying ; Yang, Yanhong ; Liu, Zhanling ; Sun, Lei

  • Author_Institution
    Ordnance Tech. Instn., Heibei Inst. of Phys. Educ., Shijiazhuang, China
  • fYear
    2012
  • fDate
    15-18 June 2012
  • Firstpage
    1305
  • Lastpage
    1308
  • Abstract
    Equipment contractor support is the innovative practice and urgent requirement to promote new-type equipment forming operational and support capability. The support delay time is a significant discrimination between contractor support and Army support. As concerned breach of contract problem, the paper will take research on three kinds of support delay time: non-repair parts supply delay time, personnel delay time, facility and equipment delay time and breach of contract delay time.
  • Keywords
    innovation management; military equipment; military systems; army support delay time; contractor support delay time; equipment contractor support; innovative practice; nonrepair parts supply delay time; personnel delay time; urgent requirement; Contracts; Delay; Logistics; Maintenance engineering; Personnel; Production facilities; Time factors; calculation model; contractor support; delay time;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Quality, Reliability, Risk, Maintenance, and Safety Engineering (ICQR2MSE), 2012 International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4673-0786-4
  • Type

    conf

  • DOI
    10.1109/ICQR2MSE.2012.6246461
  • Filename
    6246461