• DocumentCode
    2702460
  • Title

    Research on process optimization for equipment maintenance based on lean six sigma management

  • Author

    Zhao, Deyong ; Ye, Weimin ; Gao, Cuijuan

  • Author_Institution
    Dept. of Manage. Eng., Mech. Eng. Coll., Shijiazhuang, China
  • fYear
    2012
  • fDate
    15-18 June 2012
  • Firstpage
    1333
  • Lastpage
    1337
  • Abstract
    In order to optimize the process of equipment maintenance and improve the maintenance efficiency effectively, by the four steps of choosing the method of DOE, fitting the model, analyzing the residual and optimizing the result, equipment maintenance process optimization model method under equipment maintenance lean six sigma project is established based on design of experiment (DOE). Via taking a certain equipment maintenance technique parameters optimization as an illustrative example, the optimization model which can provide a new method for the optimizing of equipment maintenance process in lean six sigma project is proved to be scientific, valid, and well applicable finally.
  • Keywords
    design of experiments; lean production; maintenance engineering; optimisation; six sigma (quality); DOE; design of experiment; equipment maintenance; lean six sigma management; maintenance technique parameter optimization; process optimization; Analytical models; Fitting; Maintenance engineering; Mathematical model; Optimization; Six sigma; Temperature distribution; design of experiment; equipment maintenance; lean six sigma; process optimization;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Quality, Reliability, Risk, Maintenance, and Safety Engineering (ICQR2MSE), 2012 International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4673-0786-4
  • Type

    conf

  • DOI
    10.1109/ICQR2MSE.2012.6246467
  • Filename
    6246467