DocumentCode
2704200
Title
A Flexible Transformation Scheme between the ´OR´ of BPMN and ´Link´ of BPEL
Author
Bai, Lin ; Wei, Jun
Author_Institution
Inst. of Software, Chinese Acad. of Sci., Beijing
fYear
2008
fDate
9-12 Dec. 2008
Firstpage
1300
Lastpage
1307
Abstract
BPMN and BPEL are two process modeling languages with different syntax and semantics. Overriding their gaps to improve interoperability is one of the key issues in current service computing research. Recent works about the transformation between BPMN and BPEL mostly focus on a limited set of elements or well-formed structures. This paper expands the traditional methods by considering the multi-semantic element dasiaORpsila of BPMN and the non-structured element dasiaLinkpsila of BPEL. Furthermore, we present a flexible transformation scheme for them based on semantics equivalence and we finally designed and developed a prototype tool to implement our strategy. Our work is of great significance in relaxing the restriction on transformation between BPMN and BPEL and thus satisfying more business requirements.
Keywords
business data processing; program interpreters; programming language semantics; specification languages; BPEL; BPMN; business process execution language; business process modeling notation; business requirements; flexible transformation scheme; multisemantic element; nonstructured element; semantic equivalence; Algorithm design and analysis; Computer languages; Engines; Natural languages; Process design; Prototypes; Web services;
fLanguage
English
Publisher
ieee
Conference_Titel
Asia-Pacific Services Computing Conference, 2008. APSCC '08. IEEE
Conference_Location
Yilan
Print_ISBN
978-0-7695-3473-2
Electronic_ISBN
978-0-7695-3473-2
Type
conf
DOI
10.1109/APSCC.2008.147
Filename
4780859
Link To Document