DocumentCode :
2709242
Title :
Scheduling model of the dispersed workshop’s production system and its constructs
Author :
Bo, Wu ; Xiaohui, Zhou ; Yufeng, Ding ; Zhengfeng, Jiang
Author_Institution :
Sch. of Mech. & Electr. Eng., Wuhan Univ. of Technol., Wuhan
fYear :
2008
fDate :
21-24 April 2008
Firstpage :
1
Lastpage :
6
Abstract :
This article discussed the production system´s constitutive model of the automotive parts enterprise´s workshop, which has a typically discrete production characteristic. Firstly, it produces a general constitutive theoretical model of the workshop production scheduling system according to the manufacturing workshop production system´s constitutive model. Then it establishes the constitutive model of automotive parts enterprise´s workshop production system and its coordination model of the manufacture resources. Finally we use the Petri nets to construct workshop´s scheduling system model.
Keywords :
Petri nets; automobile industry; automotive components; job shop scheduling; production facilities; production management; Petri nets; automotive parts enterprise workshop; discrete production characteristic; manufacturing workshop; production system constitutive model; scheduling model; workshop production scheduling system; workshop production system; Discrete production characteristic; Modeling; Petri Net; System function model; Workshop production system;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Technology, 2008. ICIT 2008. IEEE International Conference on
Conference_Location :
Chengdu
Print_ISBN :
978-1-4244-1705-6
Electronic_ISBN :
978-1-4244-1706-3
Type :
conf
DOI :
10.1109/ICIT.2008.4608642
Filename :
4608642
Link To Document :
بازگشت