Determining the best sequence of load pickup during power system restoration
Author
Yari, V. ; Nourizadeh, S. ; Ranjbar, A.M.
Author_Institution
Dept. of Electr. Eng., Sharif Univ. of Technol., Tehran, Iran
fYear
2010
fDate
16-19 May 2010
Firstpage
1
Lastpage
4
Abstract
The first control action in power system restoration concerns the generation restart. In the initial phase of restoration, operators are often concerned with load pickup problems. One of the important problems during load pickup is keeping frequency response in allowable range. The aim of this paper is to determine the best sequence of load pickup by hydro and steam units during power system restoration based on frequency response of prime movers. Hydro power plants and combustion turbine units have the capability of black start operation and can be used for early stages of power system restoration. This paper considers hydro power plants for evaluating the stability and frequency response during load pickup in the early stages of restoration. Load pickup scheme has been developed based on using a pair of interconnected units.
Keywords
Combustion; Control systems; Frequency response; Hydraulic turbines; Power generation; Power system control; Power system restoration; Power system stability; Power systems; Transfer functions; frequency; generation start up; load pickup; power system restoration;
fLanguage
English
Publisher
ieee
Conference_Titel
Environment and Electrical Engineering (EEEIC), 2010 9th International Conference on
Conference_Location
Prague, Czech Republic
Print_ISBN
978-1-4244-5370-2
Electronic_ISBN
978-1-4244-5371-9
Type
conf
DOI
10.1109/EEEIC.2010.5489994
Filename
5489994
Link To Document