• DocumentCode
    2717637
  • Title

    Determining the best sequence of load pickup during power system restoration

  • Author

    Yari, V. ; Nourizadeh, S. ; Ranjbar, A.M.

  • Author_Institution
    Dept. of Electr. Eng., Sharif Univ. of Technol., Tehran, Iran
  • fYear
    2010
  • fDate
    16-19 May 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The first control action in power system restoration concerns the generation restart. In the initial phase of restoration, operators are often concerned with load pickup problems. One of the important problems during load pickup is keeping frequency response in allowable range. The aim of this paper is to determine the best sequence of load pickup by hydro and steam units during power system restoration based on frequency response of prime movers. Hydro power plants and combustion turbine units have the capability of black start operation and can be used for early stages of power system restoration. This paper considers hydro power plants for evaluating the stability and frequency response during load pickup in the early stages of restoration. Load pickup scheme has been developed based on using a pair of interconnected units.
  • Keywords
    Combustion; Control systems; Frequency response; Hydraulic turbines; Power generation; Power system control; Power system restoration; Power system stability; Power systems; Transfer functions; frequency; generation start up; load pickup; power system restoration;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Environment and Electrical Engineering (EEEIC), 2010 9th International Conference on
  • Conference_Location
    Prague, Czech Republic
  • Print_ISBN
    978-1-4244-5370-2
  • Electronic_ISBN
    978-1-4244-5371-9
  • Type

    conf

  • DOI
    10.1109/EEEIC.2010.5489994
  • Filename
    5489994