DocumentCode
2718807
Title
Analysis of electrical safety level test for barehand work at 765kV vertical double circuit six bundle conductors T/L in Korea
Author
Kim, D.S. ; Kim, J.H. ; Han, S.O.
Author_Institution
Korea Electr. Contractors Assoc., Seoul, South Korea
fYear
2009
fDate
26-30 Oct. 2009
Firstpage
1
Lastpage
5
Abstract
Nowadays hot-line work is a general maintenance method in most countries. Specially, 765 kV vertical double circuit six bundle conductors transmission line constructed and operating in Korea, necessity of the live line work is grow up, due to the difficulties of the power suspension, most towers on the mountain, big sized towers and high costs of the generation constraints. The 765 kV transmission line will be maintained by live-line work for efficient operation. In order to maintain the 765 kV transmission lines safely by barehand work, preferentially, we should know the analysis of electrical safety level test. This paper studied about analysis of electrical safety level test in live line work at 765 kV vertical double circuit six bundle conductors transmission line.
Keywords
electrical safety; maintenance engineering; power cables; power overhead lines; barehand work; electrical safety level test; general maintenance method; hot-line work; live-line work; power suspension; six bundle conductor transmission line; vertical double circuit six bundle conductors; voltage 765 kV; Appropriate technology; Circuit testing; Conductors; Distributed parameter circuits; Electrical safety; Flashover; IEC standards; Poles and towers; Power transmission lines; Voltage; 765kV Vertical Double Circuits; Barehand Work; Electrical Safety Level; Live-line Work; Six Bundle Conductors T/L;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission & Distribution Conference & Exposition: Asia and Pacific, 2009
Conference_Location
Seoul
Print_ISBN
978-1-4244-5230-9
Electronic_ISBN
978-1-4244-5230-9
Type
conf
DOI
10.1109/TD-ASIA.2009.5356820
Filename
5356820
Link To Document