DocumentCode
2720071
Title
Fast optimization method for service restoration in sub-transmission systems with priority loads
Author
Watanabe, I. ; Takehara, A. ; Nakachi, Y. ; Verma, S.C.
Author_Institution
Syst. Eng. Res. Lab., Central Res. Inst. of Electr. Power Ind. (CRIEPI), Komae, Japan
fYear
2009
fDate
26-30 Oct. 2009
Firstpage
1
Lastpage
4
Abstract
This paper proposes a new optimization method for service restoration in sub-transmission systems. The proposed method has some functions to ensure feasible switching operations and to speed up the optimization process. To adequately assess the unrestored total power after network switching operation, we model it as a restoration priority constrained maximum subset-sum problem. Moreover, the method uses only three promising candidates for the final radial configuration to speed up the process. Computational results with a test sub-transmission system show that the proposed method can find better solutions faster than the existing method.
Keywords
optimisation; power system restoration; power transmission; power transmission planning; fast optimization method; operational planning problem; service restoration; subtransmission systems; Asia; Genetic algorithms; Hydrogen; Optimization methods; Power supplies; Power system modeling; Power system planning; Power system reliability; Power system restoration; System testing; optimization methods; power system reliability; power system restoration;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission & Distribution Conference & Exposition: Asia and Pacific, 2009
Conference_Location
Seoul
Print_ISBN
978-1-4244-5230-9
Electronic_ISBN
978-1-4244-5230-9
Type
conf
DOI
10.1109/TD-ASIA.2009.5356898
Filename
5356898
Link To Document