DocumentCode :
2720117
Title :
Were the control room design reviews worth it?
Author :
Van Cott, Harold P.
Author_Institution :
Van Cott & Assoc., Bethesda, MD, USA
fYear :
1997
fDate :
8-13 Jun 1997
Firstpage :
12114
Lastpage :
12479
Abstract :
The author discusses his work in human factors aspects of nuclear power station control rooms design. He briefly outlines his work for BioTech on the preparation of the NUREG 0700 guidelines and on a contract with Duke Power Company as well as other experiences
Keywords :
control facilities; human factors; nuclear power stations; power station control; Duke Power Company; NUREG 0700 guidelines; control room design reviews; human factors; nuclear power station control rooms; Accidents; Arm; Contracts; Domestic safety; Ergonomics; Guidelines; Home appliances; Human factors; Industrial control; Industrial training;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Human Factors and Power Plants, 1997. Global Perspectives of Human Factors in Power Generation., Proceedings of the 1997 IEEE Sixth Conference on
Conference_Location :
Orlando, FL
Print_ISBN :
0-7803-3769-7
Type :
conf
DOI :
10.1109/HFPP.1997.624824
Filename :
624824
Link To Document :
بازگشت