DocumentCode :
2723713
Title :
TPX assembly plan
Author :
Knutson, Donald
Author_Institution :
Plasma Phys. Lab., Princeton Univ., NJ, USA
Volume :
2
fYear :
1993
fDate :
11-15 Oct 1993
Firstpage :
703
Abstract :
The TPX machine will be assembled in the TFTR Test Cell at the Plasma Physics Laboratory, utilizing the existing TFTR machine foundation. Preparation of the area for assembly will begin after completion of the decontamination and decommissioning phase on TFTR and certification that the radiation levels remaining, if any, are consistent with the types of operations planned. Assembly operations begin with the arrival of the first components, and conclude, approximately 24 months later, with the successful completion of the integrated systems tests and the achievement of a first plasma
Keywords :
fusion reactor design; fusion reactors; TFTR Test Cell; TPX assembly plan; decommissioning; decontamination; integrated systems tests; radiation levels; Assembly; Boring; Fixtures; Laboratories; Machining; Physics; Plasmas; Secure storage; System testing; Welding;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Fusion Engineering, 1993., 15th IEEE/NPSS Symposium on
Conference_Location :
Hyannis, MA
Print_ISBN :
0-7803-1412-3
Type :
conf
DOI :
10.1109/FUSION.1993.518425
Filename :
518425
Link To Document :
بازگشت