DocumentCode :
2730639
Title :
Modeling temporal relations in task hierarchies for job shop scheduling
Author :
Weisser, Paul, Jr. ; Cochran, Stephen
Author_Institution :
United Technol. Res. Center, East Hartford, CT, USA
fYear :
1990
fDate :
21-23 May 1990
Firstpage :
39
Lastpage :
46
Abstract :
An overview of the cooperative scheduling system is presented, and the techniques used to represent and reason about the temporal relations between the tasks to be scheduled by the system are described. The approach taken models the temporal relations in a graph whose vertices are points in time and whose edges represent the temporal constraints between them as described by T.L. Dean (1985). The representation is extended, however, by using a general caching algorithm, independent time maps linked to each other by pointers, and an explicitly hierarchical arrangement of these time maps
Keywords :
graph theory; inference mechanisms; production control; cooperative scheduling system; general caching algorithm; graph; inference mechanisms; job shop scheduling; production control; reason; task hierarchies; temporal relations; Artificial intelligence; Assembly; Cascading style sheets; Job shop scheduling; Local area networks; Manufacturing; Processor scheduling; Resource management; Silver; Workstations;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Integrated Manufacturing, 1990., Proceedings of Rensselaer's Second International Conference on
Conference_Location :
Troy, NY
Print_ISBN :
0-8186-1966-X
Type :
conf
DOI :
10.1109/CIM.1990.128068
Filename :
128068
Link To Document :
بازگشت