• DocumentCode
    2730991
  • Title

    An integrated environment for planning and scheduling in flow-chop manufacturing plants

  • Author

    Carvalho, Luis ; Almeida, Ricardo ; Bispo, Carlos ; Sentieiro, João

  • Author_Institution
    UMM, Lisbon, Portugal
  • fYear
    1990
  • fDate
    21-23 May 1990
  • Firstpage
    55
  • Lastpage
    62
  • Abstract
    An automatic planner and scheduler is described for manufacturing plants with m machines, n jobs, and a flow-shop structure. Given a production problem, the scheduler algorithm allocates the jobs to the set of machines by minimizing the total production time. The schedule is generated by alternatively using a forward and backward allocation strategy with a rule-based criterion. The scheduler was designed to solve problems where the resources may not be available at all production instants, due to the existence of work shifts. Sufficient conditions for optimality are stated and representative simulation results are presented. The interface between the industrial production needs and the scheduler is provided by a planner, which finds the net production needs to accomplish each particular production order, and feeds that information to the scheduler module
  • Keywords
    knowledge based systems; optimisation; production control; allocation strategy; flow-chop manufacturing plants; integrated environment; optimality; planning; rule-based criterion; scheduling; Job production systems; Job shop scheduling; Manufacturing automation; Production planning; Production systems; Pulp manufacturing; Raw materials; Scheduling algorithm; Strategic planning; Sufficient conditions;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Integrated Manufacturing, 1990., Proceedings of Rensselaer's Second International Conference on
  • Conference_Location
    Troy, NY
  • Print_ISBN
    0-8186-1966-X
  • Type

    conf

  • DOI
    10.1109/CIM.1990.128070
  • Filename
    128070