DocumentCode :
273367
Title :
Planning of plant refurbishment
Author :
Wade, J.A. ; Longman, A.D.
fYear :
1988
fDate :
7-8 Nov 1988
Firstpage :
9
Lastpage :
15
Abstract :
The authors describe four very different types of plant refurbishment planning-three hydro stations which can be classified as mini, small and conventional and one thermal station. The circumstances leading to refurbishment are quite different for each project described, but having made the decision, the route to implementation should be reasonably conventional. The most important ingredient in planning is defining the scope of work. On site inspection and testing is essential as review of operation and maintenance logs and discussions with power house staff can give leads as to what needs to be done. Investment at this stage-including the loss of generation while machines are being inspected-will remove many delays and financial shocks during implementation.
Keywords :
hydroelectric power stations; inspection; maintenance engineering; testing; thermal power stations; hydroelectric power stations; inspection; maintenance; power station refurbishment planning; testing; thermal power stations;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Refurbishment of Power Station Electrical Plant, 1988. International Conference on
Conference_Location :
IET
Print_ISBN :
0-85296-371-8
Type :
conf
Filename :
20558
Link To Document :
بازگشت