    Examples of hydro generator refurbishment in Ontario Hydro and the CEGB

  • Author

    Lyles, J.F. ; Smith, J.W.R.

  • Author_Institution
    Ontario Hydro, Toronto, Ont., Canada
  • fYear
    1988
  • fDate
    7-8 Nov 1988
  • Firstpage
    176
  • Lastpage
    180
  • Abstract
    The authors consider the options available when refurbishment of hydro plant is required. Two examples of refurbishment of hydro generator plant are described which cover two different approaches for plant refurbishment. These are the partial or complete re-planting. An example of complete re-planting of a 51.5 MW hydro generator by Ontario Hydro is described, and the partial refurbishment of a 90 MW pump storage generator-motor by the CEGB considered
  • Keywords
    hydroelectric generators; maintenance engineering; pumped-storage power stations; 51.5 MW; 90 MW; CEGB; Ontario Hydro; complete re-planting; hydro generator refurbishment; partial re-planting; pump storage generator-motor;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Refurbishment of Power Station Electrical Plant, 1988. International Conference on
  • Conference_Location
    London
  • Print_ISBN
    0-85296-371-8
  • Type

    conf

  • Filename
    20590