Examples of hydro generator refurbishment in Ontario Hydro and the CEGB
Author
Lyles, J.F. ; Smith, J.W.R.
Author_Institution
Ontario Hydro, Toronto, Ont., Canada
fYear
1988
fDate
7-8 Nov 1988
Firstpage
176
Lastpage
180
Abstract
The authors consider the options available when refurbishment of hydro plant is required. Two examples of refurbishment of hydro generator plant are described which cover two different approaches for plant refurbishment. These are the partial or complete re-planting. An example of complete re-planting of a 51.5 MW hydro generator by Ontario Hydro is described, and the partial refurbishment of a 90 MW pump storage generator-motor by the CEGB considered
Keywords
hydroelectric generators; maintenance engineering; pumped-storage power stations; 51.5 MW; 90 MW; CEGB; Ontario Hydro; complete re-planting; hydro generator refurbishment; partial re-planting; pump storage generator-motor;
fLanguage
English
Publisher
iet
Conference_Titel
Refurbishment of Power Station Electrical Plant, 1988. International Conference on
Conference_Location
London
Print_ISBN
0-85296-371-8
Type
conf
Filename
20590
Link To Document